Premier Inn Cambridge, Cambridgeshire project used architects Axiom Architects and main contractor was Speymill Cotracts Ltd along with Page Group (Peterborough) LTD as fabricators to complete the £359,000 budgeted project.
The Premier Inn Cambridge project included Acoustic Glazing required to Bedrooms and Barrier Glazing to Stair Towers. Due to the building being timber framed Page group also had to allow for 13mm shrinkage per floor in the curtain wall by using expansion joints at each floor level.
The project was completed on time and on budget.